R. Armstrong, S. Gao, and L. Lei, A zero-inventory production and distribution problem with a fixed customer sequence, Annals of Operations Research, vol.80, issue.4, p.395414, 2008.
DOI : 10.1007/s10479-007-0272-3

J. F. Bard and N. , A branch-and-price algorithm for an integrated production and inventory routing problem, Computers & Operations Research, vol.37, issue.12, pp.2202-2217, 2010.
DOI : 10.1016/j.cor.2010.03.010

J. Billaut, T. Drevon, and J. Tournamille, A complete view of the scheduling problem of chemotherapy production with expensive and perishable raw materials, 20th Conference of the International Federation of Operational Research Societies (IFORS2014), 2014.

H. G. Campbell, R. A. Dudek, and M. L. Smith, Machine Sequencing Problem, Management Science, vol.16, issue.10, pp.630-637, 1970.
DOI : 10.1287/mnsc.16.10.B630

Z. Chen, Integrated Production and Outbound Distribution Scheduling: Review and Extensions Operations Research, p.130148, 2010.
DOI : 10.1287/opre.1080.0688

URL : http://www.rhsmith.umd.edu/faculty/zchen/papers/chen-ipods-or-mainbody.pdf

F. , D. Croce, M. Ghirardi, and R. Tadei, Recovering Beam Search: enhancing the beam search approach for combinatorial optimization problems, Journal of Heuristics, vol.10, pp.89-104, 2004.

B. Fahimnia, R. Z. Farahani, R. Marian, and L. Luong, A review and critique on integrated productiondistribution planning models and techniques Journal of manufacturing systems, pp.1-19, 2013.

P. Farahani, M. Grunow, and H. Gnther, Integrated production and distribution planning for perishable food products, Flexible Services and Manufacturing Journal, vol.38, issue.5, p.2851, 2012.
DOI : 10.1080/07408170600559706

F. Glover, Tabu Search -Part I, ORSA Journal on Computing, vol.1, issue.3, pp.1990-206, 1989.
DOI : 10.1287/ijoc.1.3.190

F. Glover, Tabu Search???Part II, ORSA Journal on Computing, vol.2, issue.1, pp.4-32, 1990.
DOI : 10.1287/ijoc.2.1.4

N. G. Hall and C. N. Potts, Supply Chain Scheduling: Batching and Delivery, Operations Research, vol.51, issue.4, p.566584, 2003.
DOI : 10.1287/opre.51.4.566.16106

URL : http://www.mathematik.uni-osnabrueck.de/research/OR/pms2000/abstract/potts129.uk.ps

Y. Kergosien, J. Tournamille, B. Laurence, and J. Billaut, Planning and tracking chemotherapy production for cancer treatment: A performing and integrated solution, International Journal of Medical Informatics, vol.80, issue.9, pp.655-662, 2011.
DOI : 10.1016/j.ijmedinf.2011.06.002

URL : https://hal.archives-ouvertes.fr/hal-00638252

Y. Kergosien, M. Gendreau, and J. Billaut, A Benders decomposition based heuristic for a combined transportation and scheduling problem in chemotherapy production, Operational Research Applied to Health Services (ORAHS13), 2013.
URL : https://hal.archives-ouvertes.fr/hal-01025870

C. Y. Lee, C. , and Z. L. , Machine scheduling with transportation considerations, Journal of Scheduling, vol.39, issue.1, p.324, 2001.
DOI : 10.1287/opre.40.4.750

URL : http://www.seas.upenn.edu:8080/~zlchen/papers/transportation_final.PDF

J. K. Lenstra and A. H. Kan, Complexity of vehicle routing and scheduling problems, Networks, vol.12, issue.2, pp.221-227, 1981.
DOI : 10.1016/S0022-0000(76)80016-5

URL : https://ir.cwi.nl/pub/20665/20665A.pdf

C. L. Li, G. Vairaktarakis, and C. Y. Lee, Machine scheduling with deliveries to multiple customer locations, European Journal of Operational Research, vol.164, issue.1, pp.39-51, 2005.
DOI : 10.1016/j.ejor.2003.11.022

URL : http://ira.lib.polyu.edu.hk/bitstream/10397/1836/1/44%20Final-Version.pdf

A. Mazier, J. Billaut, and J. Tournamille, Scheduling preparation of doses for a chemotherapy service, Annals of Operations Research, vol.149, issue.2, pp.145-154, 2010.
DOI : 10.1007/s10479-009-0624-2

URL : https://hal.archives-ouvertes.fr/hal-01025558

M. Nawaz, . Enscore, E. E. Jr, and I. Ham, A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem, Omega, vol.11, issue.1, p.9195, 1983.
DOI : 10.1016/0305-0483(83)90088-9

G. Steiner and R. Zhang, Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains, Journal of Scheduling, vol.29, issue.3, p.565574, 2012.
DOI : 10.1007/978-1-4684-2001-2_9

E. Taillard, Some efficient heuristic methods for the flow shop sequencing problem, European Journal of Operational Research, vol.47, issue.1, pp.65-74, 1990.
DOI : 10.1016/0377-2217(90)90090-X

E. Vallada, R. Ruiz, and G. Minella, Minimising total tardiness in the m-machine flowshop problem: A review and evaluation of heuristics and metaheuristics, Computers & Operations Research, vol.35, issue.4, pp.1350-1373, 2008.
DOI : 10.1016/j.cor.2006.08.016

C. Virguz and S. Knust, Integrated production and sitribution scheduling with lifespan constraints, Annals of Operations Research, vol.213, pp.293-318, 2014.

C. C. Wu, W. C. Lee, and T. Chen, Heuristic algorithms for solving the maximum lateness scheduling problem with learning considerations, Computers & Industrial Engineering, vol.52, issue.1, pp.124-132, 2007.
DOI : 10.1016/j.cie.2006.10.007