A zero-inventory production and distribution problem with a fixed customer sequence, Annals of Operations Research, vol.80, issue.4, p.395414, 2008. ,
DOI : 10.1007/s10479-007-0272-3
A branch-and-price algorithm for an integrated production and inventory routing problem, Computers & Operations Research, vol.37, issue.12, pp.2202-2217, 2010. ,
DOI : 10.1016/j.cor.2010.03.010
A complete view of the scheduling problem of chemotherapy production with expensive and perishable raw materials, 20th Conference of the International Federation of Operational Research Societies (IFORS2014), 2014. ,
Machine Sequencing Problem, Management Science, vol.16, issue.10, pp.630-637, 1970. ,
DOI : 10.1287/mnsc.16.10.B630
Integrated Production and Outbound Distribution Scheduling: Review and Extensions Operations Research, p.130148, 2010. ,
DOI : 10.1287/opre.1080.0688
URL : http://www.rhsmith.umd.edu/faculty/zchen/papers/chen-ipods-or-mainbody.pdf
Recovering Beam Search: enhancing the beam search approach for combinatorial optimization problems, Journal of Heuristics, vol.10, pp.89-104, 2004. ,
A review and critique on integrated productiondistribution planning models and techniques Journal of manufacturing systems, pp.1-19, 2013. ,
Integrated production and distribution planning for perishable food products, Flexible Services and Manufacturing Journal, vol.38, issue.5, p.2851, 2012. ,
DOI : 10.1080/07408170600559706
Tabu Search -Part I, ORSA Journal on Computing, vol.1, issue.3, pp.1990-206, 1989. ,
DOI : 10.1287/ijoc.1.3.190
Tabu Search???Part II, ORSA Journal on Computing, vol.2, issue.1, pp.4-32, 1990. ,
DOI : 10.1287/ijoc.2.1.4
Supply Chain Scheduling: Batching and Delivery, Operations Research, vol.51, issue.4, p.566584, 2003. ,
DOI : 10.1287/opre.51.4.566.16106
URL : http://www.mathematik.uni-osnabrueck.de/research/OR/pms2000/abstract/potts129.uk.ps
Planning and tracking chemotherapy production for cancer treatment: A performing and integrated solution, International Journal of Medical Informatics, vol.80, issue.9, pp.655-662, 2011. ,
DOI : 10.1016/j.ijmedinf.2011.06.002
URL : https://hal.archives-ouvertes.fr/hal-00638252
A Benders decomposition based heuristic for a combined transportation and scheduling problem in chemotherapy production, Operational Research Applied to Health Services (ORAHS13), 2013. ,
URL : https://hal.archives-ouvertes.fr/hal-01025870
Machine scheduling with transportation considerations, Journal of Scheduling, vol.39, issue.1, p.324, 2001. ,
DOI : 10.1287/opre.40.4.750
URL : http://www.seas.upenn.edu:8080/~zlchen/papers/transportation_final.PDF
Complexity of vehicle routing and scheduling problems, Networks, vol.12, issue.2, pp.221-227, 1981. ,
DOI : 10.1016/S0022-0000(76)80016-5
URL : https://ir.cwi.nl/pub/20665/20665A.pdf
Machine scheduling with deliveries to multiple customer locations, European Journal of Operational Research, vol.164, issue.1, pp.39-51, 2005. ,
DOI : 10.1016/j.ejor.2003.11.022
URL : http://ira.lib.polyu.edu.hk/bitstream/10397/1836/1/44%20Final-Version.pdf
Scheduling preparation of doses for a chemotherapy service, Annals of Operations Research, vol.149, issue.2, pp.145-154, 2010. ,
DOI : 10.1007/s10479-009-0624-2
URL : https://hal.archives-ouvertes.fr/hal-01025558
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem, Omega, vol.11, issue.1, p.9195, 1983. ,
DOI : 10.1016/0305-0483(83)90088-9
Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains, Journal of Scheduling, vol.29, issue.3, p.565574, 2012. ,
DOI : 10.1007/978-1-4684-2001-2_9
Some efficient heuristic methods for the flow shop sequencing problem, European Journal of Operational Research, vol.47, issue.1, pp.65-74, 1990. ,
DOI : 10.1016/0377-2217(90)90090-X
Minimising total tardiness in the m-machine flowshop problem: A review and evaluation of heuristics and metaheuristics, Computers & Operations Research, vol.35, issue.4, pp.1350-1373, 2008. ,
DOI : 10.1016/j.cor.2006.08.016
Integrated production and sitribution scheduling with lifespan constraints, Annals of Operations Research, vol.213, pp.293-318, 2014. ,
Heuristic algorithms for solving the maximum lateness scheduling problem with learning considerations, Computers & Industrial Engineering, vol.52, issue.1, pp.124-132, 2007. ,
DOI : 10.1016/j.cie.2006.10.007